Skip to main content
FINANCIAL TRANSPARENCY // STARTING PRICES

Transparent pricing, firm quotes after diagnostic

No hidden costs or guesswork: we publish our baseline fees across every service tier. A binding fixed-fee proposal is issued following your preliminary feasibility diagnostic.

RECOMMENDED STARTING POINT

Preliminary Feasibility Diagnostic — from $100

Before committing thousands to design drawings, we verify borough zoning bylaws, setbacks, mandatory professional requirements, and preliminary budgets. Delivered in 48 to 72 hours.

✓ 100% credited toward your drawing package fees if you proceed with our team.

Scope of Work What is included Timeline Price (Pre-tax) Action
Feasibility Diagnostic
Recommended First Step
Borough zoning review, legal requirements, site constraints, indicative budget. 100% credited toward your drawing package if you proceed. 48 to 72 hrs from $100 Details ↗
As-Built Survey & Existing Drawings
On-site laser measurement visit, floor plans, sections, and elevations in BIM format (up to 1,000 sq ft). 5 to 10 days from $450 Details ↗
Interior Renovation (Non-structural)
2 layout concepts, full permit drawings, building code compliance table, municipal submission & follow-up, 2 revision rounds. 2 to 4 weeks from $900 Details ↗
Structural Renovation (Load-Bearing Wall Removal)
External OIQ Engineer
Design plans, structural calculations & drawings signed and sealed by an external licensed engineer (OIQ), permit application package. 3 to 5 weeks from $2,600 Details ↗
Building Addition & Extension
External Engineering
Preliminary site survey, building design layout, complete drawing set, external structural engineering coordination when required, borough permit coordination. 4 to 8 weeks from $3,500 Details ↗
Storey Addition, New Construction, 3+ Storeys
External OAQ / OIQ Members
Plans signed and sealed by an architect or engineer member of their professional order, where required by law. Complete multidisciplinary coordination. Custom scope 3% to 6% (from $4,500) Details ↗
Commercial & Workplace Space Planning
Design layout, technical floor plans, MEP engineering coordination as needed by external engineers, permit package (up to 1,500 sq ft). 3 to 6 weeks from $2,200 Details ↗
Minor Variance (Dérogation mineure), SPAIP / PIIA
Standardized drawings, contextual integration presentation boards (PIIA), 3D renderings, graphical brief, Urban Planning Committee defense. Borough dependent from $600 Details ↗
3D Rendering & Visualization
Photorealistic day or night view (interior, exterior, aerial, or exploded axonometric). High-resolution 4K. 3 to 5 days from $150 / view Details ↗
Contractor RBQ Tender Packages
Technical tender specifications, request for bids sent to 3 RBQ-licensed general contractors, identical-basis comparative evaluation grid. 1 to 2 weeks from $350 Details ↗
Project Coordination & Jobsite Visits
Stakeholder coordination, milestone scheduling, regular jobsite inspection visits, progress reports, and variation tracking. Construction span $85 / hour Details ↗
B2B BIM Subcontracting & Technical Drafting
Production capacity for firms & contractors: Revit modeling, Scan-to-BIM, custom families, clash detection, template creation. Per engagement $70 / hour Details ↗
REAL-WORLD ESTIMATES

Representative Project Budget Calculations

CASE N° 01 // RESIDENTIAL INTERIOR

Kitchen & Bathroom Remodel

Interior spatial redesign in a Montreal duplex without affecting load-bearing walls or unit fire separations.

Permit drawing package: $900
City permit fee (minimum): ≈ $167
Pre-construction subtotal: ≈ $1,067
CASE N° 02 // REAR ADDITION

Rear Building Extension (20 m²)

Single-family home in Montreal with estimated construction value of $100,000.

Plans + Structural Engineering: $3,500
City permit fee ($9.80/$1k): ≈ $980
Pre-construction subtotal: ≈ $4,480
CASE N° 03 // COMMERCIAL FIT-OUT

Coffee Shop Fit-out (800 sq ft)

Street-level commercial suite, universal accessibility and NBC fire safety code compliance.

Design & permit package: $2,200
City permit fee (commercial min.): ≈ $492
Pre-construction subtotal: ≈ $2,692

* Mandatory notice: Indicative examples only. Municipal permit fees are payable directly to the City of Montreal. A firm fixed-fee quotation is provided after your preliminary feasibility diagnostic.

Third-Party Municipal & Surveying Fees

Costs to budget depending on project scope (payable directly to authorities and surveyors):

  • City of Montreal Permit: $9.80 per $1,000 of construction value (residential minimum: $167.40 / commercial minimum: $491.70).
  • Certificate of Location: prepared by a licensed Quebec land surveyor if building footprint changes.
  • Environmental or Geotechnical Testing: soil testing or asbestos assessment when required by borough authorities.

Contractual Terms & Payment Milestones

  • Standard Milestone Schedule: 30% upon contract signing · 40% upon preliminary drawings delivery · 30% upon permit submission.
  • Revision Rounds Included: 2 comprehensive revisions included with every engagement ($150 / additional series).
  • Taxes: GST (5%) and QST (9.975%) apply on all listed amounts.