From concept to permit, a single point of contact

A structured workflow designed to eliminate regulatory guesswork, coordinate external engineering fees, and accelerate borough permit approval across Montreal.

01 TIMELINE: 15 minutes

Initial Qualification Call

Direct conversation to assess the scope of work, project address, spatial goals, target budget, and critical timelines.

CLIENT DELIVERABLE

✓ Strategic orientation & preliminary scope assessment

02 TIMELINE: 48 to 72 hrs

Feasibility Diagnostic

Comprehensive verification of borough zoning bylaws (setbacks, footprint, maximum height, parking), heritage constraints (PIIA/SPAIP), and mandatory professional licensing requirements. 100% credited toward your drawing package fees.

CLIENT DELIVERABLE

✓ Regulatory analysis brief + action roadmap

03 TIMELINE: 1 to 3 days

Proposal, Agreement & Retainer

Fixed-fee proposal detailing deliverable milestones, external engineering coordination fees, and clear payment stages (30% / 40% / 30%).

CLIENT DELIVERABLE

✓ Transparent service agreement & delivery schedule

04 TIMELINE: 5 to 10 business days

On-Site Survey & As-Built Drawings

Millimeter-accurate laser measurements and 3D scanning to construct an exact virtual twin of existing conditions (bearing walls, structural depths, service shafts).

CLIENT DELIVERABLE

✓ Digital BIM Model (Revit) & as-built drawings

05 TIMELINE: 5 to 10 business days

Spatial Concept & Layout Options

Exploration of functional spatial configurations with surface balances, circulation clearances, and perspective views for confident client sign-off.

CLIENT DELIVERABLE

✓ 2 to 3 floor plan options & 3D visualizations

06 TIMELINE: 2 to 4 weeks + City timeline

Drawings Packages, Technical Coordination & City Permit

Full technical drafting compliant with borough requirements and the Construction Code (CCQ / NBC). Seamless coordination of structural engineering drawings prepared, signed, and sealed by a licensed OIQ engineer when required by law. Direct filing and diligent tracking with municipal plan examiners.

CLIENT DELIVERABLE

✓ Complete permit package (plans signed and sealed by an external engineer or architect where required)

07 TIMELINE: 1 to 2 weeks

RBQ Contractor Bidding Package

Preparation of technical tender specs, invitation to 3 vetted RBQ-licensed general contractors, identical-basis bid comparison, and objective guidance.

CLIENT DELIVERABLE

✓ Comparative bid evaluation matrix & recommendation

08 TIMELINE: Construction span

Jobsite: Technical Coordination & Site Visits

Periodic jobsite visits to review work conformity against drawing sets, resolving unforeseen conditions collaboratively with the contractor.

CLIENT DELIVERABLE

✓ Site inspection logs & change order registers

09 TIMELINE: 1 week

Closeout & Final As-Built Documentation

Incorporation of final jobsite adjustments, delivery of as-built drawing archives (PDF / DWG / RVT on request), and permanent asset record keeping.

CLIENT DELIVERABLE

✓ Complete digital archive package (As-Built)

MANDATORY STATUTORY NOTICE ON MUNICIPAL TIMELINES:

The review period for permit applications is solely under the jurisdiction of the Urban Planning and Inspection departments of each Montreal borough (or local municipality). No firm can legally guarantee a specific permit issuance date. Our mandate is to submit an impeccably prepared, code-compliant application package to minimize revisions and examiner delays.